{"id":3266,"date":"2026-07-23T02:35:00","date_gmt":"2026-07-23T02:35:00","guid":{"rendered":"https:\/\/www.glsteel-structure.com\/?p=3266"},"modified":"2026-07-25T02:17:25","modified_gmt":"2026-07-25T02:17:25","slug":"steel-structure-frame-review","status":"publish","type":"post","link":"https:\/\/www.glsteel-structure.com\/zh\/steel-structure-frame-review\/","title":{"rendered":"\u5916\u5899\u8986\u5c42\u53ca\u8bbe\u5907\u5b89\u88c5\u524d\u7684\u94a2\u7ed3\u6784\u6846\u67b6\u68c0\u67e5"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Steel structure frame decisions affect more than a single drawing or purchase order. This guide is written to help project teams conduct a disciplined pre-closure review before cladding and equipment make structural areas difficult to see or correct. It gives buyers, project managers and technical reviewers a sequence for asking useful questions, collecting evidence and closing gaps before they become workshop rework or site delay.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A good steel structure frame review does not replace engineering judgment, the contract documents or local regulations. It creates a common record for the owner, designer, fabricator, inspector and installation team. Use the checklist at project kick-off, repeat it when interfaces change, and record who approved each final decision.<\/p>\n\n\n\n<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>\u76ee\u5f55<\/h2><nav><ul><li><a href=\"#define-the-pre-closure-boundary\">\u5b9a\u4e49\u5173\u95ed\u524d\u7684\u8fb9\u754c<\/a><\/li><li><a href=\"#confirm-surveyed-geometry\">\u786e\u8ba4\u6d4b\u7ed8\u51e0\u4f55\u5f62\u72b6<\/a><\/li><li><a href=\"#verify-bolted-joints-are-complete\">\u68c0\u67e5\u87ba\u6813\u8fde\u63a5\u662f\u5426\u5b8c\u6574<\/a><\/li><li><a href=\"#close-welding-and-repair-records\">\u5173\u95ed\u710a\u63a5\u548c\u7ef4\u4fee\u8bb0\u5f55<\/a><\/li><li><a href=\"#check-bracing-and-stability-elements\">\u68c0\u67e5\u652f\u6491\u548c\u7a33\u5b9a\u6027\u6784\u4ef6<\/a><\/li><li><a href=\"#inspect-bases-and-foundation-interfaces\">\u68c0\u67e5\u57fa\u5ea7\u4e0e\u5730\u57fa\u7684\u8fde\u63a5\u5904<\/a><\/li><li><a href=\"#coordinate-cladding-and-equipment-attachments\">\u534f\u8c03\u5916\u5899\u9970\u9762\u4e0e\u8bbe\u5907\u5b89\u88c5<\/a><\/li><li><a href=\"#issue-a-controlled-release\">\u53d1\u5e03\u53d7\u63a7\u516c\u544a<\/a><\/li><li><a href=\"#steel-structure-frame-review-table\">\u94a2\u7ed3\u6784\u6846\u67b6\u5ba1\u67e5\u8868<\/a><\/li><li><a href=\"#authoritative-references-for-the-project-team\">\u9879\u76ee\u56e2\u961f\u7684\u6743\u5a01\u53c2\u8003\u8d44\u6599<\/a><\/li><li><a href=\"#frequently-asked-questions\">\u5e38\u89c1\u95ee\u9898<\/a><\/li><li><a href=\"#turn-the-steel-structure-frame-brief-into-a-controlled-release\">\u5c06\u94a2\u7ed3\u6784\u6846\u67b6\u7b80\u62a5\u8f6c\u5316\u4e3a\u5206\u9636\u6bb5\u53d1\u5e03<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"define-the-pre-closure-boundary\">\u5b9a\u4e49\u5173\u95ed\u524d\u7684\u8fb9\u754c<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. The practical decision is to mark exactly which bays, levels and interfaces are ready for review and which remain active work areas. This is not a paperwork exercise. It connects the intended use to decisions that fabrication and site teams must execute without guessing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request a signed area-release drawing and open-item list. That evidence helps control partial completion being mistaken for acceptance. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"confirm-surveyed-geometry\">\u786e\u8ba4\u6d4b\u7ed8\u51e0\u4f55\u5f62\u72b6<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. At this stage, the project team should check grid position, levels, plumbness, span, critical clearances and interfaces using agreed datums. The review should use project-specific requirements and the applicable local rules; a detail that worked elsewhere is not automatic evidence for this project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request a survey report with actual readings and instrument details. That evidence helps control cladding or equipment absorbing structural alignment errors. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures3.jpg\" alt=\"steel structure frame fabrication and industrial steelwork review\" class=\"wp-image-3133\" srcset=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures3.jpg 1000w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures3-300x225.jpg 300w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures3-768x576.jpg 768w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures3-16x12.jpg 16w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures3-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"verify-bolted-joints-are-complete\">\u68c0\u67e5\u87ba\u6813\u8fde\u63a5\u662f\u5426\u5b8c\u6574<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. A reliable review begins when the buyer and responsible engineer confirm correct fasteners, washers, bolt orientation where specified, installation method and inspection status. Questions raised here are inexpensive to resolve compared with changes after cutting, coating or delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request bolt inspection records matched to connection locations. That evidence helps control temporary bolts or incomplete joints being hidden. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"close-welding-and-repair-records\">\u5173\u95ed\u710a\u63a5\u548c\u7ef4\u4fee\u8bb0\u5f55<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. The most useful coordination step is to ensure site welds, attachments, examination, repairs and coating restoration are complete before access disappears. Procurement teams add value by making the interface visible, assigning an owner and requiring a dated answer before the next irreversible step.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request weld maps, inspection reports and repair approvals. That evidence helps control unfinished or undocumented weld work behind later finishes. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures4.jpg\" alt=\"steel structure frame fabrication and industrial steelwork review\" class=\"wp-image-3134\" srcset=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures4.jpg 1000w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures4-300x225.jpg 300w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures4-768x576.jpg 768w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures4-16x12.jpg 16w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures4-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"check-bracing-and-stability-elements\">\u68c0\u67e5\u652f\u6491\u548c\u7a33\u5b9a\u6027\u6784\u4ef6<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. Before approval, require the project team to verify permanent bracing, ties, diaphragms and collector details before temporary supports are removed. The aim is not to design through a checklist. It is to expose missing inputs so the qualified designer, fabricator and site team can close them deliberately.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request a stability release and marked-up framing plan. That evidence helps control loads entering an incomplete stability system. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"inspect-bases-and-foundation-interfaces\">\u68c0\u67e5\u57fa\u5ea7\u4e0e\u5730\u57fa\u7684\u8fde\u63a5\u5904<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. For a buildable result, the relevant disciplines need to review base plates, nuts, grout, drainage, coating and any approved corrections at column feet. A short coordination meeting around the latest drawings is usually more useful than exchanging disconnected comments without a shared reference.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request base inspection records and final survey information. That evidence helps control poor bearing or water traps becoming concealed by floors and finishes. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures.jpg\" alt=\"steel structure frame fabrication and industrial steelwork review\" class=\"wp-image-3130\" srcset=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures.jpg 1000w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures-300x225.jpg 300w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures-768x576.jpg 768w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures-16x12.jpg 16w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2026\/02\/steel-structures-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"coordinate-cladding-and-equipment-attachments\">\u534f\u8c03\u5916\u5899\u9970\u9762\u4e0e\u8bbe\u5907\u5b89\u88c5<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. The review should test whether the team can confirm secondary steel, holes, brackets, tolerances and no-drill zones with installers before they modify the frame. Where requirements conflict, record the query and obtain approval from the party named in the contract rather than relying on workshop custom.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request approved interface drawings and attachment schedules. That evidence helps control field cutting or welding changing primary members. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"issue-a-controlled-release\">\u53d1\u5e03\u53d7\u63a7\u516c\u544a<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel structure frame planning should begin with the question this section is trying to answer. A clear release depends on the team being able to list accepted areas, residual items, protection requirements and restrictions before handing the frame to following trades. Treat the output as controlled project information because later inspections and handovers will depend on the same assumptions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the steel structure frame project file, request a pre-closure certificate with photographs and responsibilities. That evidence helps control later damage being confused with original fabrication or erection work. Review the actual document, drawing or measurement rather than accepting a general statement that the item has been considered. If the evidence is preliminary, label it accordingly and set a specific point when it must be replaced by approved information.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"350\" src=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2025\/05\/wanggan1.jpg\" alt=\"steel structure frame fabrication and industrial steelwork review\" class=\"wp-image-2476\" srcset=\"https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2025\/05\/wanggan1.jpg 500w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2025\/05\/wanggan1-300x210.jpg 300w, https:\/\/www.glsteel-structure.com\/wp-content\/uploads\/2025\/05\/wanggan1-18x12.jpg 18w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"steel-structure-frame-review-table\">\u94a2\u7ed3\u6784\u6846\u67b6\u5ba1\u67e5\u8868<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Use the following steel structure frame table as a meeting agenda, not as a substitute for the project specification. Add the responsible party, due date and approval status in your own register. The most valuable column is often the final one because it explains why a seemingly administrative request matters to fabrication, installation or operation.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u5ba1\u6838\u5173\u53e3<\/th><th>\u9700\u8981\u63d0\u4f9b\u7684\u8bc1\u636e<\/th><th>\u95ee\u9898\u5df2\u89e3\u51b3<\/th><\/tr><\/thead><tbody><tr><td>\u5b9a\u4e49\u5173\u95ed\u524d\u7684\u8fb9\u754c<\/td><td>A signed area-release drawing and open-item list<\/td><td>Partial completion being mistaken for acceptance<\/td><\/tr><tr><td>\u786e\u8ba4\u6d4b\u7ed8\u51e0\u4f55\u5f62\u72b6<\/td><td>A survey report with actual readings and instrument details<\/td><td>Cladding or equipment absorbing structural alignment errors<\/td><\/tr><tr><td>\u68c0\u67e5\u87ba\u6813\u8fde\u63a5\u662f\u5426\u5b8c\u6574<\/td><td>Bolt inspection records matched to connection locations<\/td><td>Temporary bolts or incomplete joints being hidden<\/td><\/tr><tr><td>\u5173\u95ed\u710a\u63a5\u548c\u7ef4\u4fee\u8bb0\u5f55<\/td><td>Weld maps, inspection reports and repair approvals<\/td><td>Unfinished or undocumented weld work behind later finishes<\/td><\/tr><tr><td>\u68c0\u67e5\u652f\u6491\u548c\u7a33\u5b9a\u6027\u6784\u4ef6<\/td><td>A stability release and marked-up framing plan<\/td><td>Loads entering an incomplete stability system<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"authoritative-references-for-the-project-team\">\u9879\u76ee\u56e2\u961f\u7684\u6743\u5a01\u53c2\u8003\u8d44\u6599<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A steel structure frame specification must follow the contract and jurisdiction. Useful neutral starting points for the responsible professionals include <a href=\"https:\/\/www.aisc.org\/publications\/steel-standards\/\" target=\"_blank\" rel=\"noopener\">AISC\u94a2\u6750\u6807\u51c6<\/a>, <a href=\"https:\/\/www.osha.gov\/steel-erection\" target=\"_blank\" rel=\"noopener\">OSHA steel erection guidance<\/a>, <a href=\"https:\/\/cm.aws.org\/standards-and-publications\/codes-and-standards\/d1-1\/\" target=\"_blank\" rel=\"noopener\">AWS D1.1 structural welding information<\/a>, \uff0c\u4ee5\u53ca <a href=\"https:\/\/www.iso.org\/quality-management\" target=\"_blank\" rel=\"noopener\">ISO\u8d28\u91cf\u7ba1\u7406\u539f\u5219<\/a>. \u8bf7\u786e\u8ba4\u9002\u7528\u7684\u7248\u672c\u548c\u9002\u7528\u8303\u56f4\uff1b\u8d44\u6e90\u9875\u9762\u7684\u5185\u5bb9\u5e76\u4e0d\u610f\u5473\u7740\u5141\u8bb8\u590d\u5236\u5176\u4ed6\u9879\u76ee\u7684\u8981\u6c42\u3002.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u5982\u9700\u67e5\u770b\u672c\u7f51\u7ad9\u4e0a\u7684\u76f8\u5173\u89c4\u5212\uff0c\u8bf7\u53c2\u9605 <a href=\"https:\/\/www.glsteel-structure.com\/zh\/industrial-steel-structure-fabrication-malaysia\/\">\u5de5\u4e1a\u94a2\u7ed3\u6784\u5236\u9020\u80fd\u529b<\/a>, <a href=\"https:\/\/www.glsteel-structure.com\/zh\/how-to-choose-steel-structure-supplier\/\">\u94a2\u7ed3\u6784\u4f9b\u5e94\u5546\u9009\u62e9\u6307\u5357<\/a>, <a href=\"https:\/\/www.glsteel-structure.com\/zh\/structural-steel-types-guide-construction-buyers-explained\/\">\u7ed3\u6784\u94a2\u79cd\u7c7b\u6307\u5357<\/a>, <a href=\"https:\/\/www.glsteel-structure.com\/zh\/product\/h-beam\/\">H\u578b\u94a2\u4ea7\u54c1\u9875\u9762<\/a>, \uff0c\u4ee5\u53ca <a href=\"https:\/\/www.glsteel-structure.com\/zh\/steel-structure-welding-checklist\/\">\u94a2\u7ed3\u6784\u710a\u63a5\u68c0\u67e5\u8868<\/a>. \u5f53\u793a\u6ce2\u5668\u51c6\u5907\u5c31\u7eea\u65f6\uff0c\u8bf7\u4f7f\u7528 <a href=\"https:\/\/www.glsteel-structure.com\/zh\/contact-us\/\">\u8054\u7cfb\u9875\u9762<\/a> \u8bf7\u53d1\u9001\u56fe\u7eb8\u3001\u6570\u91cf\u3001\u4ea4\u8d27\u8981\u6c42\u4ee5\u53ca\u5c1a\u672a\u89e3\u51b3\u7684\u6280\u672f\u95ee\u9898\u3002.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">\u5e38\u89c1\u95ee\u9898<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What information is needed before a steel structure frame review starts?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Start with the latest drawings, specifications, intended use, site constraints and responsibility matrix. For steel structure frame, incomplete interface information is usually more disruptive than a missing isolated dimension because several teams may make different assumptions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Who should approve steel structure frame decisions?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The contract should identify the responsible designer and approval authority. A supplier can propose practical details, but steel structure frame changes affecting structural behavior, fire safety, durability or code compliance need review by the appropriately qualified project professional.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How can a buyer verify steel structure frame quality?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Ask for objective records linked to drawing revisions, member marks and inspection stages. For steel structure frame, certificates alone are not enough; compare the approved requirement, the performed activity, the measured result and the person authorized to accept it.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">When should the steel structure frame package be frozen?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Freeze only the defined package after critical interfaces, materials, procedures and inspection requirements are approved. If steel structure frame information must remain open, identify the affected members and prevent irreversible work until the decision is closed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What should the final steel structure frame handover contain?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Include approved and as-built drawings, material records, inspection reports, resolved nonconformances, change approvals, photographs and maintenance information relevant to steel structure frame. Organize the file so a future team can trace an item without reconstructing the project history.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"turn-the-steel-structure-frame-brief-into-a-controlled-release\">\u5c06\u94a2\u7ed3\u6784\u6846\u67b6\u7b80\u62a5\u8f6c\u5316\u4e3a\u5206\u9636\u6bb5\u53d1\u5e03<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The strongest steel structure frame outcome comes from disciplined coordination before release. Define the purpose, identify the governing documents, make interfaces visible, ask for objective evidence and stop unresolved issues from passing silently into the next stage. This approach gives the fabricator clearer instructions and gives the buyer a record that can be checked during production, delivery and site work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you are preparing a steel structure frame package for an industrial building, send the current drawings, member list, project location, schedule, finish requirements and delivery constraints through <a href=\"https:\/\/www.glsteel-structure.com\/zh\/contact-us\/\">our project inquiry page<\/a>. The initial review can then focus on missing fabrication inputs and the questions that need engineering or client approval before a reliable quotation or production plan is developed.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u5728\u7ae3\u5de5\u9a8c\u6536\u524d\uff0c\u5bf9\u94a2\u7ed3\u6784\u6846\u67b6\u8fdb\u884c\u5ba1\u67e5\uff1a\u51e0\u4f55\u5f62\u72b6\u3001\u87ba\u6813\u3001\u710a\u7f1d\u3001\u652f\u6491\u3001\u57fa\u5ea7\u3001\u63a5\u53e3\u3001\u6d82\u5c42\u3001\u6587\u4ef6\u8bb0\u5f55\u53ca\u9a8c\u6536\u653e\u884c\u3002.<\/p>","protected":false},"author":1,"featured_media":3133,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[31],"tags":[77,111,74,110],"class_list":["post-3266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-industrial-building","tag-pre-closure-inspection","tag-steel-installation","tag-steel-structure-frame"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/posts\/3266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/comments?post=3266"}],"version-history":[{"count":1,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/posts\/3266\/revisions"}],"predecessor-version":[{"id":3280,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/posts\/3266\/revisions\/3280"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/media\/3133"}],"wp:attachment":[{"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/media?parent=3266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/categories?post=3266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.glsteel-structure.com\/zh\/wp-json\/wp\/v2\/tags?post=3266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}